[vc_particles_background theid="vcparticlesbackground_1542878779_766743009" particles_number_value="80" particles_density_value="800" particles_shape_type="Circle" particles_color="#ffffff" particles_shape_stroke_color="#ffffff" particles_shape_stroke_width="0" particles_size_value="5" particles_size_random="true" particles_size_anim_enable="false" particles_opacity_value="0.5" particles_opacity_random="true" particles_opacity_anim_enable="false" particles_move_enabled="true" particles_move_direction="top-right" particles_move_random="true" particles_move_straight="false" particles_move_speed="6" particles_move_out_mode="bounce" particles_line_linked_enable_auto="true" particles_line_linked_distance="150" particles_line_linked_color="#ffffff" particles_line_linked_opacity="0.40" particles_line_linked_width="1" particles_interactivity_onhover_enable="true" particles_interactivity_onhover_mode="grab" particles_interactivity_modes_grab_distance="312" particles_interactivity_modes_grab_line_linked_opacity="0.7" particles_compatibility_customclass=".boomapps_vcrow, .vc_row, .wpb_row" particles_compatibility_zindex="2"]

University of Cambridge

How we did it

We were appointed by Imtech Engineering Services, which were working for BAM Construction on two construction lots of a total of eight in the first phase of the North West Cambridge Development which is a new, 150 – Hectare district and one of the largest capital projects in the University of Cambridge’s History.

The University took the opportunity to affect the built environment for its new 150-Hectare district and encourage sustainability throughout as it seeks a BREEAM Excellent and Code for Sustainable Homes Level 5.

To give context to the scale of the development there will also be a primary school, health care centre, hotel, care home, sports centre, supermarket, local shops and public open spaces.

The installation was in a challenging environment with such a large scale site with challenges such as timed deliveries, access restrictions and working within tight timescales but we delivered the scheme to deliver the 373kW array.

Project Headlines

Location: Cambridge
Client: Imtech Engineering
Services: System Analysis, Design, Supply and Installation

Key Facts

375kw

System Size

1,500

Solar panels fitted

298,000kwh

of Energy saved a year

BREEAM

Excellent